| Availability: | |
|---|---|
| Quantity: | |
manhole step
Elite
Engineered for underground access structures, our polypropylene copolymer-coated steel manhole steps are manufactured to DIN 19555 and EN 13101 specifications. Each step features a 12 mm solid steel core fully encapsulated in a PP copolymer layer, designed for sewage manholes, stormwater chambers, basement vaults, and utility access shafts. Municipal contractors, wastewater treatment plant operators, and infrastructure developers specify these steps for projects requiring compliance with European access safety standards.
The 12 mm steel bar provides structural rigidity, while the PP copolymer coating forms a barrier against corrosive elements present in sewage and groundwater environments. Each unit undergoes load testing to verify a minimum capacity of 400 kg per step. Type test reports and compliance documentation are available for project submittal packages.
The load-bearing core is fabricated from 12 mm diameter solid steel bar, bent to a U-shape with two parallel mounting legs. The steel substrate provides the tensile strength required for vertical access applications. Each bar is straightened and cut to precise tolerances before the coating process begins.
The entire steel surface is coated with a polypropylene copolymer layer applied through a dipping process. The coating covers all exposed surfaces, including the foot tread area and both mounting legs. This layer serves three functions: corrosion resistance against sewage chemicals, slip resistance through a textured surface finish, and electrical insulation for utility vault applications.
Parameter | Specification |
|---|---|
Standard Compliance | DIN 19555, EN 13101 |
Core Material | 12 mm diameter solid steel bar |
Coating Material | Polypropylene (PP) copolymer |
Minimum Load Capacity | ≥400 kg per step (tested per EN 13101) |
Mounting Hole Diameter | 25 mm |
Mounting Hole Depth | 70 mm |
Center-to-Center Distance Between Legs | 330 mm |
Protrusion from Wall | 150 mm |
Foot Tread Length | 200 mm |
Brand | Elite |
Model | MS-PP-12 |
Installation requires a hammer drill with a 25 mm masonry bit, a sledgehammer, and a spirit level. No additional screws, bolts, or mounting hardware are needed for standard wall installation.
Mark two hole positions on the manhole wall at 330 mm center-to-center spacing. Ensure the line between marks is level.
Drill two 25 mm diameter holes to a depth of 70 mm using a rotary hammer drill. Clear all dust and debris from the holes.
Insert both legs of the manhole step into the drilled holes simultaneously.
Drive the step fully into the holes using a sledgehammer, striking the ends of the mounting legs evenly. Do not strike the center tread area to avoid coating damage.
Verify that the step protrudes 150 mm from the wall surface and sits level using a spirit level.
DIN 19555 specifies requirements for manhole steps made of steel with plastic coating, including dimensions, load testing methods, and corrosion resistance criteria. EN 13101 defines the general safety requirements for permanently installed access steps in underground structures. All production steps reference these two standards for dimensional control and performance verification.
Type testing is available through SGS, TÜV, and BV laboratories for projects requiring independent certification. Test reports cover load capacity verification, coating adhesion strength, and salt spray corrosion resistance. Clients may request witness testing or specify additional test parameters at the time of order placement. Testing fees are quoted separately based on the test scope.
Standard steps can be modified to accommodate project-specific requirements. Available options include:
Lifting eye configurations for installation handling
Custom end cap designs and rubber plug seals
Colored PP coating for visibility coding or brand matching
Extended leg lengths for thicker wall constructions
Standard packaging uses corrugated cartons with dividers. For sea freight and long-distance transport, options include plywood crates, palletized stacking, and individual polybag wrapping to prevent coating abrasion during transit.
The standard MOQ is 500 pieces. Trial orders of smaller quantities may be accommodated depending on current production schedule availability. Contact our sales team with your required quantity for lead time and pricing confirmation.
Standard production lead time is 15-20 working days for full container orders. Smaller quantities may ship within 7-10 working days if stock is available. Rush production options can be discussed for time-sensitive projects.
We provide a 2-year warranty against manufacturing defects under normal installation and use conditions. The warranty covers coating delamination, structural deformation within rated load limits, and dimensional non-conformity to stated specifications.
Yes, sample units are available for evaluation purposes. Sample fees and shipping costs apply and will be credited against subsequent bulk orders above 1000 pieces. Allow 3-5 working days for sample preparation.
Standard PP copolymer coating is formulated for sewage and stormwater applications. For potable water or drinking water contact scenarios, please specify this requirement at the time of inquiry so we can confirm material compatibility and provide appropriate test data.